The UK Innovation Corridor’s connection to high performance computing

The Innovation Corridor is home to some of the largest research facilities in the UK with a number of research campuses developed over the last 30 years. Enterprise research teams are now located alongside the publicly funded institutions such as Cambridge University, The Wellcome Trust, Sanger Institute and EMBL-EBI. Growth in this region has outpaced all other areas across the UK over the last decade with businesses collectively turning over £121 billion a year. Globally prominent as a region for invention and enterprise, there are more patents per capita in the UK Innovation Corridor than Silicon Valley.

It is also one of the best connected regions of the UK. The fibre links between Cambridge and London include some of the most extensive dark fibre infrastructure and lit services in the country. With up to 100 Gig high speed connectivity available, this is an ideal foundation for technology like high performance computing (HPC) to thrive.

Research conducted within the Innovation Corridor is set to grow exponentially over both the short term due to coronavirus research and the long term as part of the current research drive to exascale. As organisations recognise that supercomputing computations are becoming an even more important scientific tool, they are challenged to source suitable facilities for power hungry HPC clusters and GPU-powered AI installations. One of the other challenges they face is in connectivity.

Traditionally, data has sat on the same campus where research is conducted. As the complexity and power requirements of the compute grows, the current model becomes unsustainable. The drive to exascale is testing the limits of the infrastructure that currently exists and prompting a review of physical infrastructure needs. The challenge comes in enabling connectivity where the production happens with the location where HPC clusters reside at a reasonable cost. Access to high bandwidth connectivity becomes a greater priority to ensure researchers can access HPC clusters at industrial scale without noticing performance delays.

Kao Data’s campus in Harlow is located in the heart of the Innovation Corridor and built on the site of Sir Charles Kao’s pioneering discovery of fibre optic cable in 1966. The data centre is positioned within the new North London Artery and provisioned with high-density, ultra-low latency fibre routes that connect to London, Amsterdam and Dublin. As part of euNetworks’ Super Highway 1, the campus is also in a unique position of connecting London to Amsterdam and vice versa without going inside the M25 – a built in redundancy feature that avoids a single point of failure risk associated with London as the major UK connectivity hub.

We are also building partnerships to provide the right connectivity, regardless of your type of HPC compute. Kao Data’s partnership with Ai Networks and London Internet Exchange (LINX) provides peering through the LINX network and offers access to over 820 member ASN’s from over 75 countries. Providers like CenturyLink enable high fibre count connectivity providing a fast and easy route to scale up data transport requirements. Once an HPC cluster is located in the data centre, Kao Data provides an “on ramp” to multi-cloud connectivity that gives our customers flexibility between their campus, infrastructure in our data centre and workloads in the cloud to ramp up HPC workloads as needed.

In order to continue leading research in their fields of expertise and ensuring the UK is at the forefront of the global research community, super fast, secure connectivity is going to be essential. Kao Data is providing data centre solutions that enable our customers to spend their research funding from government and charity grants on lab equipment, staff vs building out data centre infrastructure on their campus. Our commitment to delivering low-latency, high-speed and resilient connectivity solutions to our customers will help fuel the next generation of breakthrough research.



Share

Other articles

March 31, 2026

Hype Cycle to Power Cycle: The Industrial Era of AI kicked off in San Jose

March 18, 2026

The UK’s AI Ambition Gap

January 22, 2026

The Quiet Revolution: Slough’s story shows how data centres can benefit the UK’s economy and communities for good

Test Text

test job title

Details

If your application is successful, Harlow Council will transfer the grant by BACS.  Bank details (account name, number and sort code) will need to be supplied with a summary of accounts. 

Funding conditions:  If your application is successful, your project must be delivered by 31 December 2026. You will have to return any grant funds if the project is not delivered or the organisation receiving the funding stops operating.

A contract agreement will need to be signed between your organisation and Harlow District Council before any funding is granted.

Monitoring and Evaluation: Grant recipients will be required to provide an end of project report to establish whether the project has met its aims and objectives, as well as to assess the overall impact on participants. Funding for the project is provided on the basis that the Project Evaluation form is returned within the agreed project timescale (no later than 31 January 2027).

Risks and Liabilities: In giving grants the ‘Harlow Council’ will require the supported project organisation or groups to accept all risks and liabilities associated with the activity being supported. This will be a condition of the grant.  Copies of relevant documents may need to be provided if the application has been approved.

Data protection statement – how we will use your information

The Council is committed to handling your personal information in line with the data processing principles.  The Data Protection Legislation and the General Data Protection Regulation 2016/679 (GDPR) sets the legal framework for how we collect, handle and process personal data and for your rights as a ‘data subject.’

General Data Protection Regulation:  Personal data provided by you will be processed in accordance with this protocol. For more details, please see https://www.harlow.gov.uk/privacy-notice

Thank you for taking the time to read these guidance notes. If you have any questions, please get in touch with [email protected].

FAQs

  1. Who can apply?
    The fund is open to not-for-profit community groups and grassroots initiatives based in Stockport.
     
  2. What types of projects are eligible?
    We encourage projects focused on environmental sustainability, community cohesion, and local economic development.
     
  3. How much funding is available?
    Grants range from £500 to £2,500 for pilot projects or to enhance existing initiatives.
     
  4. Is this the sole funding for this project?
    If not, please expand on the additional match funding that you currently have or are in the process of applying for.
     
  5. Are there any restrictions on grants under £500?
    Yes, please note that grants under £500 may be subject to different guidelines or restrictions, which will be communicated upon application.
     
  6. When will we know if our project was selected?
    Notifications will be sent by March 31, 2025.
     
  7. How can I apply for a grant?
    Applications can be submitted through our online portal, where you will find detailed guidelines and forms.
     
  8. What happens if my application is unsuccessful?
    If your application is not successful, we encourage you to seek feedback and consider reapplying in future funding rounds.
     
  9. When is the application deadline?
    Please check our website for the latest application deadlines and any upcoming funding rounds.