Is water cooling finally flowing into the data centre?

Still using air to cool your servers? Boy, you’re out of date! By now, everyone’s using liquid cooling… Or at least they should be, according to a very authoritative prediction I had from an IBM systems consultant I spoke to in 2009.

“We’ll see a return to liquid-cooling in most IT solutions,” he said, at an IDC conference in London. I guess I shouldn’t name him, but he reckoned that in ten years’ time, we’d be using liquid cooling pretty much here, there and everywhere.

We’re one year past that deadline, and the vast majority of racks in most data centers are still cooled by air. But still, every year since I had that prediction from IBM, someone has told me that liquid cooling will be widespread.

This year, engineer Robert Tozer promised that liquid cooling is inevitable at DCD’s Keeping IT Cool online event (in August 2020, still available online here). And this time round, there are liquid cooling systems that are practical: they can be added in small increments as needed.

In 2009, the argument was that companies wanting to become more efficient would invest in big liquid cooling systems to make use of waste heat: “Water-cooling is a better way to recycle the heat energy,” said my friend from IBM. “If you cool by air it is much harder to capture and condense it.” To harness that energy, it must be transferred to liquid, so it is more efficient to use liquid cooling directly, he said.

In 2020, Tozer predicts things are more imperative. We’ve now reached a point, he argues, where the energy density in our racks is becoming so great that only liquid can remove it efficiently enough.

Already, high-end processors produce so much heat that the only way to radiate it into an airstream is with a giant heatsink, said Tozer. “Look at the size of the chip compared to the size of the heatsink. As the density goes up, you literally cannot fit the heatsink into your 1U server.”

“Average rack power densities are 7kW, and that’s pushing up against the limits of what can be achieved in a conventional air cooled data center,“ said Malcolm Howe from engineering firm Cundall, in another DCD webinar. You can fill a data center with 7kW racks and still get rid of the heat, he said.

What happens next is new applications like AI bring higher density. Howe is already seeing 24kW racks: add some of those to a hall of 7kW cabinets and there simply isn’t enough air cooling to keep their temperature steady.

“It’s not stopping there”, said Kao’s CTO Gerard Thibault in that webinar. “We’re seeing potentially 125kW per cabinet.”

When applications like that arrive, data centres need a way to add higher levels of cooling to specific racks – running both alongside each other – and that’s exactly the way liquid cooling systems are being designed now.

Chassis level cooling from vendors like Iceotope builds a circulating system within the rack, so each blade can have its electronics immersed in liquid. Others, like Submer and Asperitas, are putting systems in baths of oil.

Tozer thinks that operators will need to run test systems, understand the science and serve their leading edge customers. Kao Data, for instance is already teaming up with Iceotope to run their chassis level liquid cooling systems in its Harlow facility.

This time, it looks like liquid cooling really is coming, said Tozer: “The driving force is chip densities. Businesses require the chip to do things – and if businesses require it, it will happen.”

Image: With thanks to the European OCP Experience Center.




Share

Other articles

March 31, 2026

Hype Cycle to Power Cycle: The Industrial Era of AI kicked off in San Jose

March 18, 2026

The UK’s AI Ambition Gap

January 22, 2026

The Quiet Revolution: Slough’s story shows how data centres can benefit the UK’s economy and communities for good

Test Text

test job title

Details

If your application is successful, Harlow Council will transfer the grant by BACS.  Bank details (account name, number and sort code) will need to be supplied with a summary of accounts. 

Funding conditions:  If your application is successful, your project must be delivered by 31 December 2026. You will have to return any grant funds if the project is not delivered or the organisation receiving the funding stops operating.

A contract agreement will need to be signed between your organisation and Harlow District Council before any funding is granted.

Monitoring and Evaluation: Grant recipients will be required to provide an end of project report to establish whether the project has met its aims and objectives, as well as to assess the overall impact on participants. Funding for the project is provided on the basis that the Project Evaluation form is returned within the agreed project timescale (no later than 31 January 2027).

Risks and Liabilities: In giving grants the ‘Harlow Council’ will require the supported project organisation or groups to accept all risks and liabilities associated with the activity being supported. This will be a condition of the grant.  Copies of relevant documents may need to be provided if the application has been approved.

Data protection statement – how we will use your information

The Council is committed to handling your personal information in line with the data processing principles.  The Data Protection Legislation and the General Data Protection Regulation 2016/679 (GDPR) sets the legal framework for how we collect, handle and process personal data and for your rights as a ‘data subject.’

General Data Protection Regulation:  Personal data provided by you will be processed in accordance with this protocol. For more details, please see https://www.harlow.gov.uk/privacy-notice

Thank you for taking the time to read these guidance notes. If you have any questions, please get in touch with [email protected].

FAQs

  1. Who can apply?
    The fund is open to not-for-profit community groups and grassroots initiatives based in Stockport.
     
  2. What types of projects are eligible?
    We encourage projects focused on environmental sustainability, community cohesion, and local economic development.
     
  3. How much funding is available?
    Grants range from £500 to £2,500 for pilot projects or to enhance existing initiatives.
     
  4. Is this the sole funding for this project?
    If not, please expand on the additional match funding that you currently have or are in the process of applying for.
     
  5. Are there any restrictions on grants under £500?
    Yes, please note that grants under £500 may be subject to different guidelines or restrictions, which will be communicated upon application.
     
  6. When will we know if our project was selected?
    Notifications will be sent by March 31, 2025.
     
  7. How can I apply for a grant?
    Applications can be submitted through our online portal, where you will find detailed guidelines and forms.
     
  8. What happens if my application is unsuccessful?
    If your application is not successful, we encourage you to seek feedback and consider reapplying in future funding rounds.
     
  9. When is the application deadline?
    Please check our website for the latest application deadlines and any upcoming funding rounds.