Using CFD analysis to design and build the UK Innovation Corridor’s home for HPC and AI

Precision Engineered for HPC and AI

Kao Data launched Kao Data London One (KDL1) in 2018. As the UK’s first 100% wholesale multi-tenant data centre to provide 100% free-cooling, the campus is designed to deliver cutting edge and energy efficient colocation services for high performance computing (HPC) artificial intelligence (AI) and enterprise organisations. It offers hyperscale levels of efficiency and a PUE of <1.2, even at partial loads.

Despite its unique and high-performance demands, environmental sustainability is at the heart of KDL1’s design. To ensure greater levels of energy efficiency, the team at Kao Data considered, and ultimately deployed, a refrigerant free Indirect Evaporative Cooling (IEC) system, which uses water evaporation in place of mechanical systems to cool air on hot days.

Future Facilities provided CFD simulations of both the internal and external data centre operating environments to help Kao Data make informed and data-driven decisions around design, implementation, and operations.

Design Parameters and Cooling Methodology

From inception, the Kao Data campus was designed to cater for industrial-scale intensive computing, OCP-Ready™ and GPU-accelerated Supercomputing systems. The campus was split into four data centres totaling roughly 150,000 square feet of technical space. Each facility offers a total technical load of 8.8MW, accommodating rack densities of 25kW – 40kW and beyond.

Above: The effect of the South-Westerly wind on the IEC intakes and exhausts at the south side of the building. Streamlines are coloured by wet-bulb temperature – with the humid exhaust air (orange/yellow) being carried away over the building.

Due to the demanding power and cooling requirements that accompany GPU-intensive systems, it is essential to keep them as energy efficient and sustainable as possible. This requires pinpointing operational efficiency, effective power and cooling systems, and by contracting 100% renewable energy.

Kao Data initially decided to use an Indirect Evaporative Cooling system to meet cooling requirements. IECs use external air to cool the facility, without allowing external and internal airstreams to mix. It is critical in IEC design also to segregate the intake and exhaust of the external air path to avoid moist air being drawn back in.

This is where CFD simulation came into play, specifically with regard to external modelling. To achieve such ambitious design specifications, Kao Data needed to ground its decision making in factual data. Future Facilities’ simulation and CFD software complimented Kao Data’s technical capabilities and helped manage risk and ensure industry-leading levels of efficiency, prior to committing to the build phase of the project.

Digital Twin Enables Optimised Design

Using Future Facilities CFD, Kao Data created a digital twin of their data centre, and by leveraging its market-leading 6SigmaDCX product suite, were able to evaluate the facility’s cooling performance under various conditions. This included multiple weather scenarios, operating conditions at full and partial utilisation and different configurations with the external design.

Above: A view demonstrating the relative wet-bulb temperature between the air that enters and leaves the IEC, as a result of adiabatic/evaporative cooling.

Overall, with CFD simulation, Kao Data was able to:

  • Evaluate the viability and performance of the proposed IEC design concept
  • Confirm satisfactory cooling performance of each of the proposed build-out stages
  • Demonstrate the effect of potential variations and extreme environmental conditions
  • Verify that predicted IEC inlet conditions for a variety of external conditions were acceptable and should not compromise IEC performance

Ultimately, Kao Data was able to use a CFD simulation study of the external site to understand the thermal performance of the design, as well as how this could be affected by weather conditions and the various stages of site build-out.

“Future Facilities industry-leading reputation for CFD analysis was pivotal in helping us to design and build one of the most sustainable and energy efficient facilities in the UK,” said Paul Finch, Chief Operating Office (COO) Kao Data. “It has helped us refine our decision-making process around the provision of cooling infrastructure and more recently was crucial in the deployment of NVIDIA’s Cambridge-1 supercomputer.”

Today, Kao Data and Future Facilities continue to work together and model complex designs for enterprise, HPC and artificial intelligence customers – a process which helps to maximise both operational and energy efficiency, and deliver a highly sustainable colocation solution.

The full case study, which can be accessed here, details how data centre CFD simulation enabled Kao Data to evaluate its Indirect Evaporative Cooling system and build the UK Innovation Corridor’s home for HPC, AI and industrial-scale, intensive computing.



Share

Other articles

March 31, 2026

Hype Cycle to Power Cycle: The Industrial Era of AI kicked off in San Jose

March 18, 2026

The UK’s AI Ambition Gap

January 22, 2026

The Quiet Revolution: Slough’s story shows how data centres can benefit the UK’s economy and communities for good

Test Text

test job title

Details

If your application is successful, Harlow Council will transfer the grant by BACS.  Bank details (account name, number and sort code) will need to be supplied with a summary of accounts. 

Funding conditions:  If your application is successful, your project must be delivered by 31 December 2026. You will have to return any grant funds if the project is not delivered or the organisation receiving the funding stops operating.

A contract agreement will need to be signed between your organisation and Harlow District Council before any funding is granted.

Monitoring and Evaluation: Grant recipients will be required to provide an end of project report to establish whether the project has met its aims and objectives, as well as to assess the overall impact on participants. Funding for the project is provided on the basis that the Project Evaluation form is returned within the agreed project timescale (no later than 31 January 2027).

Risks and Liabilities: In giving grants the ‘Harlow Council’ will require the supported project organisation or groups to accept all risks and liabilities associated with the activity being supported. This will be a condition of the grant.  Copies of relevant documents may need to be provided if the application has been approved.

Data protection statement – how we will use your information

The Council is committed to handling your personal information in line with the data processing principles.  The Data Protection Legislation and the General Data Protection Regulation 2016/679 (GDPR) sets the legal framework for how we collect, handle and process personal data and for your rights as a ‘data subject.’

General Data Protection Regulation:  Personal data provided by you will be processed in accordance with this protocol. For more details, please see https://www.harlow.gov.uk/privacy-notice

Thank you for taking the time to read these guidance notes. If you have any questions, please get in touch with [email protected].

FAQs

  1. Who can apply?
    The fund is open to not-for-profit community groups and grassroots initiatives based in Stockport.
     
  2. What types of projects are eligible?
    We encourage projects focused on environmental sustainability, community cohesion, and local economic development.
     
  3. How much funding is available?
    Grants range from £500 to £2,500 for pilot projects or to enhance existing initiatives.
     
  4. Is this the sole funding for this project?
    If not, please expand on the additional match funding that you currently have or are in the process of applying for.
     
  5. Are there any restrictions on grants under £500?
    Yes, please note that grants under £500 may be subject to different guidelines or restrictions, which will be communicated upon application.
     
  6. When will we know if our project was selected?
    Notifications will be sent by March 31, 2025.
     
  7. How can I apply for a grant?
    Applications can be submitted through our online portal, where you will find detailed guidelines and forms.
     
  8. What happens if my application is unsuccessful?
    If your application is not successful, we encourage you to seek feedback and consider reapplying in future funding rounds.
     
  9. When is the application deadline?
    Please check our website for the latest application deadlines and any upcoming funding rounds.