Build Back Better – Data centres are central to the NHS’s and Matt Hancock’s digital transformation plan.

As a consequence of the last 16 months the NHS is at a major crossroads. It’s no longer sustainable for this brilliant and long-standing institution to deliver patient care in the way it did pre-pandemic because expectations have shifted drammatically, and the socio-economic landscape has changed.

IT costs have increased, comms infrastructures are maxed-out and there has been a surge in demand for specialist ICU equipment, medical supplies, PPE, treatment therapies, and drug regimes. The NHS is under pressure to deliver so much right now that it needs to find new, innovative ways of achieving this if performance targets are to be met going forwards. Step forward the the era of artificial intelligence (AI), IoT and supercomputing.

Senior executives had been investigating viable ways of overhauling routine processes and logistics long before Covid-19 wreaked havoc. Indeed, when the NHS first published its long-term transformation plan in 2019, an agenda which outlined key areas for improvement over the next 10 years, it recognised that technology refreshes, IoT and digitisation were fundamental to realising performance targets, reducing waiting times, streamlining internal operations and drawing up medical regimes to maintain high standards of care, both in hospitals and the wider community.

Many aspects have already been achieved well ahead of schedule. Online services such as self-help diagnoses, online clinics, virtual ward rounds, digitised prescription processing etc were rolled out in just a few weeks to reduce in-person contact and to try and prevent facilities from reaching crisis point. And while it had teething issues (as could be expected when developing IT solutions for the masses at the coalface, during the height of a pandemic) digital services such as Track & Trace, the Covid-19 App, and the digital structure around our incredible vaccination programme have shown data can really streamline healthcare efforts.

Underpinning IT not in synch with digitised services

However, in parallel, it soon became apparent that there were major gaps in the underpinning IT infrastructures, instrumental to the smooth running of digitised healthcare which posed clinical, security and operational risks. This holds particularly true for the comms rooms housing patient files, medical records, drug inventories and other critical information.

Historically many NHS trusts have had their IT facilities dispersed across multiple buildings and multiple sites. Not only does this present synchronisation challenges, failover problems and performance inefficiencies, often resulting in system failures, these legacy facilities pose serious cybersecurity risks, with isolated data silos vulnerable to attack.

The security aspect has been heightened further over the last few months due to the need for remote access to centralised systems for homeworking purposes. The NHS fell victim to cybercrime in May 2017, bringing services to a standstill for several days and costing £millions. As more and more services are going online, cyber-crime threats are at an all-time high.

Process automation is needed for slicker operations

As well as reforming clinical processes, the digital transformation plan also recognises the need to streamline operations by embracing smart technologies powered by AI. Although huge progress has been made from a clinical perspective, day-to day operations are still reliant on human involvement. Hospitals are often understaffed at best, self-isolation and teams being confined to specific wards for the duration of their shift are not making things any easier. Everyday tasks such as tracking down the whereabouts of lifesaving ICU or other medical assets can so easily be automated, as can the management of supplies, or the delivery of vaccination supplies with short shelf-lives.

Smart technologies powered by AI are also key to accelerating drug manufacture and to the management of national databases. These same technologies are also powering machines at the forefront of medical science and fostering greater connections between front-end services like the NHS and PHE and the life sciences and pharmaceutical companies who supply and support them.

Take NVIDIA’s Cambridge-1, hosted within our Harlow data centre for example. This supercomputer – the UK’s most powerful – is being used by hospital R&D teams from Guy’s and St Thomas’ NHS Foundation Trust alongside pharmaceutical and life sciences companies such as AstraZeneca, GSK and Oxford Nanopore. This greater collaboration, albeit on one supercomputing platform, can massively accelerate research into healthcare challenges, including those caused by Covid-19.

More tech means more data

Process automation, AI and IoT are on course to transform healthcare. However, an unavoidable consequence of digitisation is the amount of data generated as a result, and the more tech deployed, the greater the need for seamless data capture and manipulation. Ambitions of truly embracing next generation technologies can be little more than a pipedream for many NHS Trusts due to their outdated systems and networks.

Commissioning an onsite data centre is not only hugely expensive, rollouts can be lengthy and specialist buildings with appropriate cooling are needed. And there is also the maintenance aspect to think of. The NHS is under constant financial scrutiny and for many facilities, having the bandwidth, let alone the expertise needed to commission appropriate infrastructure that meets stringent regulatory requirements is a non-starter.

To operate new initiatives like the National Institute for Health Protection (NIHP) and Joint BioSecurity centre as well as deliver on Matt Hancock’s 5 mission critical areas of digital health technology, resilient and robust data centre provision will be absolutely paramount.

A campus of tomorrow meeting the needs of today

This is where future-ready campuses and industrial scale colocation facilities like ours come in. Equipped with all-fibre networks for swift processing and interconnectivity via secure connections in-line with personal data protection laws, we’re able provide the robust colocation infrastructure needed to power digitised healthcare services quickly and cost effectively.

3rd party Tier 3 OCP-Ready data centre design, build and operation has already been seen by the financial services industry as a means for it to focus on shareholder development as opposed to the infrastructure to support them. This same model will hopefully now be actively absorbed and implemented across the healthcare service to free up valuable time and resource for developing patient management and associated healthcare.

And, here in Harlow, we’re helping support and nurture a genuine ecosystem of healthcare and life science organisations who are reliant on data. Whether it be the Cambridge-1 partners I’ve already mentioned, or the European Bioinformatics Institute (EMBL-EBI) who operate their data archives from our data centre, or the numerous small AI start-ups doing breakthrough work into genome sequencing and drug discovery – we’re providing the long-term foundations for digital healthcare to flourish.



Share

Other articles

March 31, 2026

Hype Cycle to Power Cycle: The Industrial Era of AI kicked off in San Jose

March 18, 2026

The UK’s AI Ambition Gap

January 22, 2026

The Quiet Revolution: Slough’s story shows how data centres can benefit the UK’s economy and communities for good

Test Text

test job title

Details

If your application is successful, Harlow Council will transfer the grant by BACS.  Bank details (account name, number and sort code) will need to be supplied with a summary of accounts. 

Funding conditions:  If your application is successful, your project must be delivered by 31 December 2026. You will have to return any grant funds if the project is not delivered or the organisation receiving the funding stops operating.

A contract agreement will need to be signed between your organisation and Harlow District Council before any funding is granted.

Monitoring and Evaluation: Grant recipients will be required to provide an end of project report to establish whether the project has met its aims and objectives, as well as to assess the overall impact on participants. Funding for the project is provided on the basis that the Project Evaluation form is returned within the agreed project timescale (no later than 31 January 2027).

Risks and Liabilities: In giving grants the ‘Harlow Council’ will require the supported project organisation or groups to accept all risks and liabilities associated with the activity being supported. This will be a condition of the grant.  Copies of relevant documents may need to be provided if the application has been approved.

Data protection statement – how we will use your information

The Council is committed to handling your personal information in line with the data processing principles.  The Data Protection Legislation and the General Data Protection Regulation 2016/679 (GDPR) sets the legal framework for how we collect, handle and process personal data and for your rights as a ‘data subject.’

General Data Protection Regulation:  Personal data provided by you will be processed in accordance with this protocol. For more details, please see https://www.harlow.gov.uk/privacy-notice

Thank you for taking the time to read these guidance notes. If you have any questions, please get in touch with [email protected].

FAQs

  1. Who can apply?
    The fund is open to not-for-profit community groups and grassroots initiatives based in Stockport.
     
  2. What types of projects are eligible?
    We encourage projects focused on environmental sustainability, community cohesion, and local economic development.
     
  3. How much funding is available?
    Grants range from £500 to £2,500 for pilot projects or to enhance existing initiatives.
     
  4. Is this the sole funding for this project?
    If not, please expand on the additional match funding that you currently have or are in the process of applying for.
     
  5. Are there any restrictions on grants under £500?
    Yes, please note that grants under £500 may be subject to different guidelines or restrictions, which will be communicated upon application.
     
  6. When will we know if our project was selected?
    Notifications will be sent by March 31, 2025.
     
  7. How can I apply for a grant?
    Applications can be submitted through our online portal, where you will find detailed guidelines and forms.
     
  8. What happens if my application is unsuccessful?
    If your application is not successful, we encourage you to seek feedback and consider reapplying in future funding rounds.
     
  9. When is the application deadline?
    Please check our website for the latest application deadlines and any upcoming funding rounds.