Supercomputing at the Speed of Light

During our careers, the opportunity to work on something genuinely ground-breaking, something pioneering that raises the bar, is extremely rare. In October, the Kao Data team was contacted by NVIDIA regarding their Cambridge-1 project. As soon as we saw the plans for the UK’s most powerful supercomputer, we were hooked.

Collaborating with NVIDIA comes with an expectation that you’ll be operating alongside some of the smartest minds in the industry; that innovation is everything and that you’ll be performing at pace. Supercharged pace. NVIDIA’s Cambridge-1 project has exceeded those expectations.

We went from first contact to a fully agreed plan of deployment in less than a month. And our partnership with one of the world’s leading technology companies – has paved the way for something truly remarkable to unfold within our Harlow campus.

Supercomputers may be rapid in operation, but they’re generally lethargic in evolution. Most large-scale, traditional supercomputers – the majority of those on the current TOP500 list – take, on average, a couple of years of concept planning, design and build.

Yet in less than 20 weeks, Cambridge-1 has gone from concept to the first stages of operation. Across this period, I’m exceptionally proud of how our agile team at Kao Data has pulled out all the stops to support NVIDIA in their race to build one of the world’s most powerful and sustainable supercomputers.

It would be impressive for this speed of build to take place in normal, ‘business-as-usual’ circumstances. But to install a 400-petaflops supercomputer in rapid time, during the most acute months of a global pandemic, is nothing short of extraordinary. As our COO, Paul Finch remarked: “Cambridge-1 has been deployed at a speed I have never witnessed during my (30-year) career.

NVIDIA Cambridge-1 (photo courtesy of NVIDIA)

Putting this into perspective, due to Covid-19 restrictions, our campus has effectively been locked-down, with access reduced to mission-critical staff only, working in rotating shifts and under the strictest of operating guidelines. Added to this, quarantine periods for international arrivals and subsequent international travel bans have resulted in much of the deployment being overseen remotely from the United States.

Throughout the journey, the innovative culture within both organisations has shone through – along with a ‘can-do’ attitude resulting in obstacles being quickly overcome. Our HPC-specialist technical and operations teams led by Paul Finch, Gérard Thibault and Howard Spooner have worked hand-in-hand with NVIDIA and it’s been a privilege to provide a bespoke home for such state-of-the-art technology.

Cambridge-1’s strategic location reinforces the Cambridge-to-London ‘UK Innovation Corridor’ as the country’s world class region for life sciences, pharma and scientific research. When fully operational, it will provide huge computing capacity to healthcare companies and institutions such as AstraZeneca, GSK, Oxford Nanopore, King’s College London and Guy’s and St Thomas’ NHS Foundation Trust.

As the UK moves out of the reactive phase of the Covid-19 pandemic, I believe Cambridge-1 is a great example of how we can genuinely ‘build-back-better’. Having supercomputing prowess like NVIDIA’s DGX SuperPOD architecture accessible and positioned in close proximity to cutting-edge healthcare, life sciences and bioinformatics clusters, enables us to better prepare for future pandemics.

Positioning AI-accelerated supercomputing resources, powered by 100% renewable energy, directly within a research ecosystem is, in my opinion, the way forward. Indeed, I agree with our VP, Spencer Lamb, who has spent more than 25 years working within UK and European research HPC, that Cambridge-1 provides the blueprint for “a completely unique, necessary and sustainable approach to the future of research computing.

Interestingly, with the deployment of Cambridge-1 at Kao Data, we have come full circle as a company. Back in 1966, the campus was the birthplace of optical fibre technology, first discovered by the brilliant Sir Charles Kao – from whom we take our name. Thousands of optical fibres networked together will facilitate Cambridge-1’s operation and connect it to the wider world. As NVIDIA’s VP of Solutions Architecture and Engineering Marc Hamilton notes in his appearance on the NVIDIA AI Podcast, I’m sure Sir Charles would be very proud to see the most powerful supercomputer in the UK – incorporating his optical fibre technology – working from the very site where he first pioneered it.

Kao Data’s data centre campus

My team and I are looking forward to continuing to support NVIDIA over the final stages of Cambridge-1’s installation and testing, and seeing the outputs from some of the incredible science and research that will take place within it. Undoubtedly it will tackle some of healthcare’s most complex and hard-to-solve challenges. But, as I have seen first-hand, when you’re working at the speed of light, anything is possible.



Share

Other articles

March 31, 2026

Hype Cycle to Power Cycle: The Industrial Era of AI kicked off in San Jose

March 18, 2026

The UK’s AI Ambition Gap

January 22, 2026

The Quiet Revolution: Slough’s story shows how data centres can benefit the UK’s economy and communities for good

Test Text

test job title

Details

If your application is successful, Harlow Council will transfer the grant by BACS.  Bank details (account name, number and sort code) will need to be supplied with a summary of accounts. 

Funding conditions:  If your application is successful, your project must be delivered by 31 December 2026. You will have to return any grant funds if the project is not delivered or the organisation receiving the funding stops operating.

A contract agreement will need to be signed between your organisation and Harlow District Council before any funding is granted.

Monitoring and Evaluation: Grant recipients will be required to provide an end of project report to establish whether the project has met its aims and objectives, as well as to assess the overall impact on participants. Funding for the project is provided on the basis that the Project Evaluation form is returned within the agreed project timescale (no later than 31 January 2027).

Risks and Liabilities: In giving grants the ‘Harlow Council’ will require the supported project organisation or groups to accept all risks and liabilities associated with the activity being supported. This will be a condition of the grant.  Copies of relevant documents may need to be provided if the application has been approved.

Data protection statement – how we will use your information

The Council is committed to handling your personal information in line with the data processing principles.  The Data Protection Legislation and the General Data Protection Regulation 2016/679 (GDPR) sets the legal framework for how we collect, handle and process personal data and for your rights as a ‘data subject.’

General Data Protection Regulation:  Personal data provided by you will be processed in accordance with this protocol. For more details, please see https://www.harlow.gov.uk/privacy-notice

Thank you for taking the time to read these guidance notes. If you have any questions, please get in touch with [email protected].

FAQs

  1. Who can apply?
    The fund is open to not-for-profit community groups and grassroots initiatives based in Stockport.
     
  2. What types of projects are eligible?
    We encourage projects focused on environmental sustainability, community cohesion, and local economic development.
     
  3. How much funding is available?
    Grants range from £500 to £2,500 for pilot projects or to enhance existing initiatives.
     
  4. Is this the sole funding for this project?
    If not, please expand on the additional match funding that you currently have or are in the process of applying for.
     
  5. Are there any restrictions on grants under £500?
    Yes, please note that grants under £500 may be subject to different guidelines or restrictions, which will be communicated upon application.
     
  6. When will we know if our project was selected?
    Notifications will be sent by March 31, 2025.
     
  7. How can I apply for a grant?
    Applications can be submitted through our online portal, where you will find detailed guidelines and forms.
     
  8. What happens if my application is unsuccessful?
    If your application is not successful, we encourage you to seek feedback and consider reapplying in future funding rounds.
     
  9. When is the application deadline?
    Please check our website for the latest application deadlines and any upcoming funding rounds.