PUE – The data centre measure of efficiency that is still going strong…

I’ve spent almost three decades working within the data centre industry and around this time of year it’s usual to see blogs, articles and commentary on “industry predictions” outlining new ways of operating, cooling and monitoring data centre capacity.

Despite all this annual change, one measure of efficiency that has always steadfastly remained is the measure of power usage effectiveness (PUE) which shows no signs of tiring.

This is because energy efficiency remains a crucial topic for data centre operators and PUE is still the best way to track performance, both from an economic and sustainability perspective. So, how do you make the most of it – and what do you do when PUE can’t be improved any further?

Data centres can be power-hungry, especially ones like our Kao Data campus in Harlow that looks after high performance and supercomputing deployments. If you’re running megawatts of compute, high density server configurations and NVIDIA GPU-supported clusters you want to make sure your data centre’s power profile is as lean and mean as possible.

In 2018 data centres consumed one per cent of all electricity used that year, worldwide. That’s a lot, but then data centres power businesses, economies, entertainment networks and much more. In 2020, we’ve depended on them more than ever. But how do we ensure that they use energy efficiently and responsibly?

The interesting news is that data centres used one per cent of the world’s electricity in 2010 as well, but although the amount of computing handled in data centres more than quintupled to 2018, the proportion of energy used remained the same. Commercial colocation data centres – especially latest generation facilities and those at industrial and hyperscale – typically do a better job of this than smaller on-premise legacy data centres because any energy they save is profit and modern design, architecture and scale can really squeeze PUE. However, sustainability agendas, energy availability and costs are giving every business a reason to cut energy use.

Driving down PUE

Doing that requires data centres to work out how they can make better use of energy, which is where power usage effectiveness (PUE) comes in. It’s calculated by dividing the power coming into the data centre by the power used to run the computing equipment in the data centre. A PUE of one would mean that all the power coming in was used by computing equipment, but this is unrealistic. Cooling, lighting, backup power supplies, security and other services all require power, but the aim is to get as close to one as possible.

At Kao Data we’ve worked hard to get our PUE to an excellent, market-leading 1.2, even at partial loads. However, there are still areas – design, configuration, cooling, etc – we are focusing on to see if we can tweak to reduce this even further. Google says it averages a PUE of 1.11 across its large-scale data centres, with some sites coming in under 1.06. The average across data centres in general has fallen from 2.5 in the mid-2000s to around 1.6 in 2020. However, Uptime Institute says the average PUE hasn’t really changed since 2013.

That’s partly because there are limits to what can be done to improve PUE at an existing data centre. Choosing a location with a low ambient temperature will reduce the need for cooling, for example, and designing the building to let in natural light will cut lighting costs. However, these measures need to be applied when the data centre is being built, and obviously not all data centres can be located in areas like the Arctic Circle. If you’re running compute in hot and humid climates your PUE task becomes much harder, but operators are still pulling out all the stops to get their facilities to be as efficient as possible.

Other measures can only be implemented once. Painting the outer walls with a weather shield coating can help with cooling, as can a roof terrace with vegetation. The layout of server racks can be optimised too: positioning alternate rows so that all cold air intakes face one way and hot air exhausts face the other creates a hot aisle/cold aisle configuration that helps to optimise cooling. Switching to LED lighting will consume less energy, too.

Developing a range of measures

Day-to-day management of the data centre can also help to optimise PUE. Monitoring the efficiency of servers and how much power they consume under pressure or while on standby can help to keep them running with optimal efficiency. Likewise, the UPS load should be matched to the system load to help keep PUE at the lowest level.

Important though it is, PUE is just part of the picture. As mentioned above, you can’t always move your data centre to another location, some compute will always need to be close to the end-user in urban environments and this is a big factor in effectiveness. A very efficient data centre in a tropical climate might have a higher PUE than a less efficient, legacy data centre in a very cold location.

Operators that have done all they can on-site can still reduce their data centre’s footprint by other means, such as by using renewable energy or finding ways to reuse the heat generated by the data centre. At Kao Data we’re doing both – using 100% certified green energy, and exploring ways we can help heat buildings across Kao Park.

PUE is by no means a perfect solution, but it remains a valuable tool that operators can use to measure their energy effectiveness at a time when pressure is growing to be as efficient as possible. PUE is here to stay and my ‘New Year prediction’ is it won’t be going anywhere, anytime soon!

If your compute’s PUE is as important to you as it is to us, then get in touch and have a virtual tour of the Kao Data campus and we’ll be delighted to show you what we’re doing to ensure we stay at the front of the PUE race.



Share

Other articles

March 31, 2026

Hype Cycle to Power Cycle: The Industrial Era of AI kicked off in San Jose

March 18, 2026

The UK’s AI Ambition Gap

January 22, 2026

The Quiet Revolution: Slough’s story shows how data centres can benefit the UK’s economy and communities for good

Test Text

test job title

Details

If your application is successful, Harlow Council will transfer the grant by BACS.  Bank details (account name, number and sort code) will need to be supplied with a summary of accounts. 

Funding conditions:  If your application is successful, your project must be delivered by 31 December 2026. You will have to return any grant funds if the project is not delivered or the organisation receiving the funding stops operating.

A contract agreement will need to be signed between your organisation and Harlow District Council before any funding is granted.

Monitoring and Evaluation: Grant recipients will be required to provide an end of project report to establish whether the project has met its aims and objectives, as well as to assess the overall impact on participants. Funding for the project is provided on the basis that the Project Evaluation form is returned within the agreed project timescale (no later than 31 January 2027).

Risks and Liabilities: In giving grants the ‘Harlow Council’ will require the supported project organisation or groups to accept all risks and liabilities associated with the activity being supported. This will be a condition of the grant.  Copies of relevant documents may need to be provided if the application has been approved.

Data protection statement – how we will use your information

The Council is committed to handling your personal information in line with the data processing principles.  The Data Protection Legislation and the General Data Protection Regulation 2016/679 (GDPR) sets the legal framework for how we collect, handle and process personal data and for your rights as a ‘data subject.’

General Data Protection Regulation:  Personal data provided by you will be processed in accordance with this protocol. For more details, please see https://www.harlow.gov.uk/privacy-notice

Thank you for taking the time to read these guidance notes. If you have any questions, please get in touch with [email protected].

FAQs

  1. Who can apply?
    The fund is open to not-for-profit community groups and grassroots initiatives based in Stockport.
     
  2. What types of projects are eligible?
    We encourage projects focused on environmental sustainability, community cohesion, and local economic development.
     
  3. How much funding is available?
    Grants range from £500 to £2,500 for pilot projects or to enhance existing initiatives.
     
  4. Is this the sole funding for this project?
    If not, please expand on the additional match funding that you currently have or are in the process of applying for.
     
  5. Are there any restrictions on grants under £500?
    Yes, please note that grants under £500 may be subject to different guidelines or restrictions, which will be communicated upon application.
     
  6. When will we know if our project was selected?
    Notifications will be sent by March 31, 2025.
     
  7. How can I apply for a grant?
    Applications can be submitted through our online portal, where you will find detailed guidelines and forms.
     
  8. What happens if my application is unsuccessful?
    If your application is not successful, we encourage you to seek feedback and consider reapplying in future funding rounds.
     
  9. When is the application deadline?
    Please check our website for the latest application deadlines and any upcoming funding rounds.